Classroom and Corridor Repairs
Client:

Brief:
Working as a subcontractor to an insurance company, in North West London this junior school had extensive flood damage which required the complete removal of the floor and first metre of wall. This was then dried and sealed, and the floor replaced along with the wall and then redecorated.